The following headings are step-by-step in-
structions for assembling the planter. Begin
with “Tools Required” and “Pre-Assembly
Checklist” to make sure you have all neces-
sary parts and equipment. Follow each step to
make the job as quick and safe as possible
and produce a properly working machine.

The planter is shipped via flat bed truck. It is
the dealer’s responsibility to unload the new
machine. Unload all equipment before begin-
ning assembly. Do not attempt any assembly
work while the planter is on the truck.

Tools Required

Pre-Assembly Checklist

1.

Before assembling, read and understand
“Important Safety Information,” beginning
on page 1.

2.

Have at least two people on hand while as-
sembling.

3.

Make sure assembly area is level and free
of obstructions (preferably an open con-
crete area).

4.

Have all major components.

5.

Have all fasteners and pins shipped with
planter.

IMPORTANT: If a pre-assembled part or
fastener is temporarily removed, remem-
ber where it goes. Keep the parts separat-
ed.

6.

Have a copy of the parts manual on hand.
If unsure of proper placement or use of
any part or fastener, refer to the parts
manual.

7.

Check that all working parts are moving
freely, bolts are tight, and cotter pins are
spread.

8.

Check for proper tension and alignment on
all drive chains.

9.

Check that all safety decals and reflectors
are located correctly and legible. Replace

Assembly

To End of

Planter Wing

To Planter

Center

24406

if improperly located or damaged. Refer to
“Safety Decals” in the operator’s manual.

10. Inflate tires to recommended pressure as listed

on the “Tire Inflation Chart,” page 20. Tighten
wheel bolts as specified on “Torque Values
Chart,” page 18.

Marker Assembly

Refer to Figure 1

1.

Attach marker transport rest weldment (1) to
wing frame using u-bolts (2) and hardware (3).

2.

Tighten bolts (2).

3.

Attach first section of marker arm (5) to wing
frame (7). NOTE: First section marker arms
come in a pair of left and right. When the
correct marker arm has been attached to
the correct corresponding wing frame,
marker shear bolt (8) will go toward planter
center.
Use bolts (6) and hardware to secure
marker arm to frame.

4.

Secure hydraulic cylinder (4) to wing frame (7)
with cylinder pin and cotter pin.

Figure 1

First Marker Arm Section