Assembly, Center brace bar & torque tube – Great Plains DVN8552 Assembly Manual User Manual
Page 12
550-353Q-ENG
02/12/2014
8
8321-8552DV
Great Plains Manufacturing, Inc.
Assembly
Center Brace Bar & Torque Tube
Refer to Figure 5
1.
Once the center Frame has been uncrated and put
on stands, the torque tube maybe installed.
2.
Carefully raise the torque tube
with an overhead
hoist and secure with 1 1/4 x 6 pins
, 3/8 x 2 1/4 Gr.
8 hex bolts and 3/8 top lock nut.
3.
Install walking beams
4.
Install pre-assembled hub assembly
using 5/16 x
4 bolts (models 8321-8537) or 1/2 x 4 1/2 bolts
(models 8544-8552)
, secure with 1/2 lock washer
and 1/2 nut.
5.
Attach the tire/wheel assemblies
to hub assembly
and secure with lug nuts
.
6.
Now install the appropriate cylinders
, see hydrau-
lics section of “Parts Manual” for correct size, using 1
x 3 11/16 pins
, 1.5 x 1.0 x.075 machine washers
and 3/16 x 2 cotter pins.
7.
Install cylinder transport locks
to cylinders
using the 3/8 x 3 pins and clip pin.
Note: Install 3/4 x 2 Gr. 5 hex bolts
, back to front as
shown.
8.
Carefully move center brace bar
into position with
fork truck or overhead hoist. Secure with 3/4 x 2 Gr.
5 hex bolts
, 3/4 lock washers and 3/4 hex nuts.
9.
All bolts may be tightened to specs, See “Torque
Values Chart” on page 43. Attach plastic end caps
to all open ends of 4 x 3 tube.
1
2
3
4
5
6
4
7
8
9
10
8
12
11
12
13