beautypg.com

Lift switch test, Calibrate tractor and planter wheel – Great Plains 3PYP Planters User Manual

Page 10

background image

10

Great Plains Manufacturing, Inc.

Front Page

Part Lists

Steering Upgrade

401-640M

Front Page

Part Lists

08/11/2010

Lift Switch Test

Refer to Figure 11 and Figure 12
It is possible to have the logic of the lift switch reversed.
Follow this procedure to check the switch logic.

43. The tractor must be running.

44. The IntelliAg

®

Monitor must be on.

45. The main screen must be showing on the screen.

46. With the planter in the full up position the direction

arrow located in the upper right portion of the
IntelliAg

®

Monitor screen should be pointing up

and RED in color.

47. Set the planter in the planting position (fully down)

and the arrow should point down

and be GREEN

in color.

48. If the arrow is pointing down when the planter is up

from step 40 switch the following wires:

- Steering Harness Other White wire to Switch Harness Green
- Steering Harness Red wire to Switch Harness Black

49. Recheck the arrow direction on the Intelliag Monitor:

The arrow should be pointing up and RED

when

the planter is in the FULL UP position.

The arrow should be pointing down and GREEN
when the planter is in the planting position FULLY
DOWN.

Calibrate Tractor and Planter Wheel

Once the steering control components and repro-
grammed ECU are installed the right/center/left tractor
and planter wheel calibration is required. The system will
not function until the calibration process has been suc-
cessfully completed. See the operators manual for direc-
tions. No EHPR (electrohydraulic proportional regulating)
calibration is required.

Figure 11

Intelliag Monitor Main Screen

Red Arrow Pointing Up

29806

1

1

2

Figure 12

Intelliag Monitor Main Screen

Green Arrow Pointing Down

29805

2

1

2