Re-install torque tabs, Reconnect clutch linkages, Ud f b – Great Plains 3S-3000HD Assembly Instructions User Manual
Page 17
Great Plains Mfg., Inc.
Installation Instructions
17
03/24/2009
118-253M
Refer to Figure 30
96. Select one new:
136-064D CHAIN RL #40 51 PITCHES
Route chain around sprockets and idlers as shown.
Engage idlers at front for
1
⁄
4
in (6cm) slack.
Re-install Torque Tabs
This applies to wings only, unless electric clutches are
installed, in which case the center clutch also has a
torque tab.
Refer to Figure 31
97. Select the saved:
and two sets of saved:
Rotate the clutch torque tab
up and slightly back.
Place the engage tab
over it, and secure with
bolt
, flat washer
, lock washer
and nut
.
Reconnect Clutch Linkages
If the drill has electric clutches, installation is complete.
Skip these last steps.
Start with the left wing.
Refer to Figure 32
98. Swing the
CLUTCH SHUTOFF LINK, 00 SERIES
toward the clutch.
99. At the rear end of:
install one saved set:
802-017C HHCS 3/8-16X1 GR5
803-215C NUT NYLOCK JAM THIN 3/8-16 PLT
100. Re-attach the free end of:
807-072C SPRING EXT 1 1/16 ODX.120WX5.5
101. Repeat step 98 through step 100 for the right wing.
Note: The center section has no mechanical clutch.
Figure 30
Main-Aux Chain Routing
29365
U
D
F
B
23T
Figure 31
Re-install Clutch Tabs
29359
1
U
D
F
B
L
R
Figure 32
Re-Connect Clutch Linkage
29359
U
D
F
B
L
R