Transport & placement, Transport procedure – Wheatheart WHR 130 x 31-36ft Augers PTO-SD User Manual
Page 29

WHEATHEART - GHR130 & WHR130 GRAIN AUGERS
4. T
RANSPORT
& P
LACEMENT
PTO-SD & EMD D
RIVE
M
ODELS
4.1. T
RANSPORT
P
ROCEDURE
16652 R1
29
4. Transport & Placement
4.1. TRANSPORT PROCEDURE
Follow all safety precautions when transporting the auger and use a proper
towing vehicle.
1. If auger is raised, place in full down position. The roller track shoe should be
seated against the upper track stop with slight tension on the lift cable. Refer
to “Lowering & Completion” on page 37.
2. Lock winch: turn handle clockwise until 2 clicks are heard.
Important:
The winch must have a minimum of 3 wraps of cable on drum when auger is in
transport position.
3. Place and secure hitch pin and safety chain. The safety chain should be
threaded though handle on the lower tube and wrapped around auger tube
before attaching to the towing vehicle (Figure 4.1).
Figure 4.1
Important:
Use a type of hitch pin (see Figure 4.1) that will not allow auger to separate from
towing vehicle.
4. Be aware of overhead obstructions and electrical wires and devices. The
130-31’/36’ augers need a minimum clearance of 10.5’-11’ (3.2m - 3.35m) in
normal transport position.
Warning: Before continuing, ensure you have read and understand the relevant information
in the safety section. Safety information is provided to help prevent serious injury, death, or
property damage.