Wheatheart WHR 130 x 31-36ft Augers PTO-SD User Manual
Page 20

3. A
SSEMBLY
WHEATHEART - GHR130 & WHR130 GRAIN AUGERS
3.6. EMD D
RIVE
PTO-SD & EMD D
RIVE
M
ODELS
20
16652 R1
STEPS 9. THROUGH 16. MAY BE COMPLETED AT THIS TIME OR AFTER
AUGER TUBE AND UNDERCARRIAGE ASSEMBLY IS COMPLETED.
9. Place drive pulley onto motor shaft, then insert square key and tighten set
screws. (A 4" to 4-1/2" pulley is recommended. Pulley and square key are not
supplied).
10. Attach electric motor to motor mount with four bolts and locknuts (not
provided) and four square washers (provided). The square washers go inside
the mount channels.
11. Attach the “narrow” guard mount angle to the motor mount channels with two
7/16" x 1-1/4" bolts, square washers, and locknuts. Align angle with outside
edge of the mount channels.
12. Place belts on the pulleys and apply slight tension. Align the two pulleys with
a straight edge, then tighten set screws.
13. Apply final tension to belts with the 1/2” x 9" adjusting bolts on the motor
mount.
Note:
The correct operating tension is the lowest tension at which the belts will not slip
under peak load conditions.
14. Place the short angle on top of the gearbox as shown and attach with two
1/2” x 1" bolts and lockwashers.
Figure 3.8
15. Attach the guard to gearbox assembly by bolting the guard mount bracket to
the short angle with one 3/8" x 3/4" bolt and washer locknut.
16. Secure the other end of guard by bolting the “wide” guard mount angle to the
“narrow” guard mount angle with two 5/16" x 5" bolts and locknuts. Adjust the
width of guard at the motor pulley to suit the pulley diameter.