Metrohm Inline Dialysis User Manual
Page 15

■■■■■■■■■■■■■■■■■■■■■■
3 Installation
IC equipment: Dialysis
■■■■■■■■
9
■
Using the tweezers, place the wet dialysis membrane centrally
inside the sealing ring onto the cell.
7 Assembling the dialysis cell
■
Place the upper part of the dialysis cell on the bottom part in such
a way that the two guide bolts fit exactly into the two bore holes.
8 Screwing the dialysis cell together
■
Screw the five screws with the washers in the dialysis cell by hand
first.
■
Then firmly tighten them with the hex key in crosswise sequence.