beautypg.com

Metrohm Wall-Jet-Cell User Manual

Page 17

background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

IC equipment Wall-Jet cell

■■■■■■■■

11

Connecting the electrode cables to the measuring cell

Prerequisites:

The working electrode and the reference electrode are inserted into
the measuring cell.

1 Plug the angled plug of the working electrode cable (labeled WE)

into the working electrode socket.

2 Plug the angled plug of the reference electrode cable (labeled RE)

into the reference electrode socket.

3 Plug the angled plug of the auxiliary electrode cable (labeled AE) into

the socket (labeled AE).