beautypg.com

Intake installation – Bully Dog 51200 Rapid Flow Induction (RFI) Cold Air Intake User Manual

Page 15

background image

14

3. Put the stage 2 tube into place and prepare to tighten the band clamps.

4. When tightening the stage 2 intake tube concentrate on the OEM side before tightening
the lid assembly side. Snug the stage 2 tube all the way up to the OEM intake duct so that
plastic touches plastic or just a small gap. Work the short silicone tube up over the OEM
intake duct so that the silicone covers both tubes and then use the band clamps to secure
the connection.

Intake Installation