Operating controls – Bunn AF PR-3 User Manual
Page 5

5
OPERATING CONTROLS
A. MAIN POWER ON/OFF
The main power ON/OFF switch is located on the right of the front panel just above the power cord.
B. REFILL CIRCUIT ON/OFF
The refill circuit ON/OFF switches are located on the right of the front panel just above the main power switch.
These allow each circuit to operate independently of the other.
This manual is related to the following products:
See also other documents in the category Bunn Water equipment:
- TDO-3.5 (2 pages)
- TDS3 (2 pages)
- TCD (3 pages)
- ULTRA-1 (17 pages)
- ULTRA-1 (2 pages)
- TDS-5S (3 pages)
- EASY CLEAR H5E (2 pages)
- AFPO-2 SL (25 pages)
- EASY CLEAR EQ-12-TH (2 pages)
- WATER QUALITY SYSTEM EQHP-25L (2 pages)
- EASY CLEAR EQ-17-TL (2 pages)
- HW2 (4 pages)
- LCA-2 (22 pages)
- LCA-2 LP 38791.0000K (26 pages)
- HW2A (4 pages)
- ULTRA-2 (23 pages)
- FMD-2 (2 pages)
- SILVER SERIES JDF-2S (28 pages)
- FCD-4 (21 pages)
- EASY CLEAR EQHP-ESP (2 pages)
- FMDS-3 (2 pages)
- TDO-N-4.0LP (2 pages)
- ULTRA-2 PAFA (4 pages)
- JDF-2 (21 pages)
- LCR-2C (2 pages)
- TCD-2 (18 pages)
- FMD DBC-3 4-CUP (4 pages)
- LCR-3 (27 pages)
- EQHP-10L (2 pages)
- 2 (3 pages)
- Water Quality System EQHP-35L (2 pages)
- Chilled LCC-2 (26 pages)
- TDO-4T TDO-5 (2 pages)
- ICD3 (3 pages)
- Water Quality System EQHP-TWIN 108SP (2 pages)
- TCD-1 (2 pages)
- TDO-N (2 pages)
- FMD-5 (45 pages)
- JDF-4S (2 pages)
- JDF-2S (28 pages)
- AFPO-3 SL (25 pages)
- Complete Store Water Quality Systems EQHP-TWIN 70L (2 pages)
- EDSS-11-T200F (2 pages)
- TDO-N-3.5 (2 pages)