beautypg.com

Behavior after power restoration – Yamato Scientific DN410I Inert Oven User Manual

Page 32

background image

26

Behavior after Power Restoration

In case of power failure during operation, the controller resumes the following operations after the power

restoration.

In case of power failure during the program operation

The controller automatically resumes the program operation where it left at the power shutdown. In case

that the temperature inside the chamber is outside the specified temperature range based on the setpoint

temperature, the controller goes to the FORECED WAIT STATE until the temperature inside the chamber

comes back to the specified temperature range. When you select the display of the remaining time by

pushing the Display key in this condition, the sub display shows

.

The timer built-in the controller does not count as running time for a period of power failure.

In case of power failure during the Auto-Stop operation

The controller automatically resumes the Auto-Stop operation where it left at the power shutdown. In

case that the temperature inside the chamber is outside the specified temperature range based on the

setpoint temperature after the power restoration, the controller goes to the FORECED WAIT STATE until

the temperature inside the chamber comes back to the specified temperature range. When you select the

display of the remaining time by pushing the Display key in this condition, the sub display shows

. (Forced Wait)

In case that the operation stop time is set in a period of time, the timer built in the controller does not

count as running time for a period of power failure. On the contrary, in case that the operation stop time

is set in hours, the timer built in the controller counts as running time for a period of power failure.

When the operation stop time reaches during power failure, the controller stops running just after the

power restoration.

In case of power failure while the controller is in standby condition

In case that the operation start time is set in a period of time, the timer built in the controller does not

count as standby time for a period of power failure. On the contrary, in case that the operation start

time is set in hours, the timer built in the controller counts as standby time for a period of power failure.

When the operation start time reaches during power failure, the controller starts running just after the

power restoration.

In case of power failure during the fixed temperature operation and a soak period of

the Auto-Start operation

The controller resumes running toward to the preset temperature after the power restoration.