Vigo VG06062 User Manual
Page 6

6
MODEL VG06062
PREPARATION STEPS TO FOLLOW BEFORE INSTALLATION
1.
Remove the plastic layer from the base border (if needed). Do NOT remove the plastic layer off
the plastic platform of the base.
2.
Properly apply silicone to the wall and base joints.
3.
Make sure to read corresponding base instructions carefully prior to install on the Vigo Brand
Shower Door System. Failure to do so can cause water leakage and bodily harm.
IMPORTANT
To prevent damage to the finish, you should protect the shower cabin bottom with a cardboard
protector before beginning the installation.
Ensure that there is sufficient structural support behind the shower wall to hold the weight of the
shower door. If there is insufficient support, then reinforce the shower walls with wooden studs
prior to shower door installation. [SEE FIG.2]
INSTALLATION STEPS
A.
INSTALLING THE BOTTOM RAIL
PLEASE NOTE THAT WHEN INSTALLING, THE LARGER OF THE SIDE RAILS IS YOUR HINGE
BASE RAIL. THE LARGER OF THE 2 RAILS GOES WITH GLASS PANEL #4. SEE FIG.1 TO
MATCH CONFIGURATION. (THE DIFFERENCE IS MINIMAL, PLEASE REVIEW PRIOR TO INSTALL)
RIGHT SIDE DOOR OPENING
LEFT SIDE DOOR OPENING
A
A
B
C
B
C
A
A
B
B
C
C
FIG.1
CAUTION
!
GASKETS NEED TO BE IN BETWEEN ALL GLASS AND METAL CONTACT. FAILURE TO
DO SO CAN LEAD TO BREAKAGE AND POTENTIAL BODILY HARM.