Recommended Hardware

Qty

Description

Manufacturer P/N

4

Ring lug

Panduit LCAS6-10-L

Kit # 26647 contains:

Qty

Description

4

#10-32 screw

4

#10 flat washer

4

#10 lock washer

4

#10 hex nut

All hardware is stainless steel except the ring lug.
Kit # 26647 is included with the Customer Evaluation Board.

Initial Set Up

To test the PRM® mounted to the board it is necessary to configure the switch bank
(Item 5) as shown on the silk screen in Figure 3. Placing the switch bank in this state
connects a fixed resistor between OS and SG of the PRM that sets the output voltage of
the PRM to the nominal value indicated on its respective data sheet.
Failure to configure the switch bank in this state prior to testing may result in
improper output or no output.

Baseline Test Procedure - PRM-CB

(Refer to Figure 3)

1.0

Recommended Equipment

1.1

DC power supply – 0-100 V; 500 W

1.2 DC electronic load – pulse capable; 0-100 V; 100 A minimum

1.3 DMM

1.4 Oscilloscope

1.5 Appropriately sized interconnect cables

1.6 Fastening hardware

1.7 Fan (if the PRM is to be operated for extended periods of time or at an elevated

ambient temperature we recommend the supplied heat sink be installed)

1.8 Safety glasses

1.9 Data sheet for the requisite PRM