beautypg.com

Installation operating instructions, Aeration adjustment, First fire – Regency Horizon HZO42 Outdoor Gas Fireplace User Manual

Page 31: Operating instructions, Lighting procedure, Shutdown procedure

background image

Regency Horizon™ HZO42 Gas Fireplace

31

31

INSTALLATION

OPERATING INSTRUCTIONS

AERATION

ADJUSTMENT

Open the air shutter for a blue fl ame or close for a
yellower fl ame. The burner aeration is factory set
but may need adjusting due to either the local gas
supply or altitude.

Minimum Air Shutter Opening:

1/8"

Natural

Gas

1/4"

Propane

CAUTION: Carbon will be produced if air shutter
is closed too much.

Note: Any damage due to carboning resulting from

improperly setting the aeration controls is NOT
covered under warranty.

Note: Aeration Adjustment should only be per-

formed by an authorized FPI Installer at the
time of installation or service.

FIRST FIRE

The fi rst fi re in your fi replace is part of the paint
curing process. To ensure that the paint is properly
cured, it is recommended that you burn your fi replace
for at least four (4) hours the fi rst time you use it
.
When fi rst operated, the unit will release an odour
caused by the curing of the paint, the burning off of
any oils remaining from manufacturing.

The glass panel may require cleaning after the unit
has cooled down.

DO NOT ATTEMPT TO CLEAN THE
GLASS WHILE IT IS HOT.

Note: When the glass is cold and the appliance

is lit, it may cause condensation and fog
the glass. This condensation is normal
and will disappear in a few minutes as
the glass heats up.

OPERATING

INSTRUCTIONS

1) Read and understand these instructions before

operating this appliance.

2) Check to see that all wiring is correct and

enclosed to prevent possible shock.

3) Check to ensure there are no gas leaks.

4) Ensure that the stainless panels are installed.

5) Verify log placement. If the pilot cannot be

seen when lighting the unit, the logs have been
incorrectly positioned.

6) The unit should never be turned off, and on

again without a minimum of a 60 second wait.

LIGHTING PROCEDURE

1) Turn on ON/OFF switch.

2) Press and release on ON/OFF button once.

3) After approximately 4 seconds the spark igni-

tion system will spark for 60 seconds to light

the main burner.

4) The unit will turn on.

Note: The fi rst try for ignition will last approximately

60 seconds. If there is no fl ame ignition (rectifi -

cation) the board will stop sparking for approxi-

mately 35 seconds. After wait time , the board

will start second try for ignition by sparking for

approximately 60 seconds . If there is still no

positive ignition the board will go into lock out.

The system will need to be reset as follows:

a) Turn the system off using ON/OFF switch.

b) After approximately 2 seconds turn on ON/

OFF switch.

c) Unit will repeat step 2.

SHUTDOWN

PROCEDURE

1) Turn ON/OFF switch.
2) If service is to be performed - you must discon-

nect both sources of power to the unit, the main
power and battery.