Ultraschwank uhe infrasave ultimate eih, Burner & tube kit assembly chart models uhe, eih – Schwank ultraSchwank EIH User Manual
Page 44

44
UHE-F / EIH-F I&O Manual
IM100205
RD: MAY 2014
RL: 06A
26. BURNER & TUBE KIT ASSEMBLY CHART MODELS UHE, EIH
MODELS UHE & EIH are approved for indoor commercial / industrial non-residential applica-
tions. For outdoor, wet and harsh environment applications refer to models UHE-P / EIH-P and
UHE-S / EIH-S.
BEFORE INSTALLING: Check that you have the correct tube kit(s) for the burner input
MODELS:
ultraSchwank UHE
InfraSave Ultimate EIH
High Radiant Output Tube Heaters for Commercial / Industrial Indoor Applications
COMPLETE
60 Mbh
60 to 130
160 & 200
6 ft
None
None
None
2 ft
6 ft
None
3 ft
TK-P620-UL TK-P020-UL TK-PH20-UL TK-S020-UL TK-S220-UL TK-S620-UL TK-S010-UL TK-S310-UL
Input Btuh
Tube
Length
20'
20'
20'
20'
20'
20'
10'
10'
20'
1
30'
1+
1
30'
1+
1
40'
1+
1
40'
1+
1
50'
1+
1+
1
50'
1+
1
1
60'
1+
1+
1
50'
1+
1+
1
60'
1+
1+
1
70'
1+
2+
1
NOTE: UHE / EIH Series Burners require 120V electrical supply
Tube Kits for models UHE & EIH have an insulated double reflector.
All tube kits include tubes, insulated reflectors, tube couplers, and hangers required for installation.
Model 60,000 x 20 ft has a 6 ft turbulator installed in a tube in the Primary Tube Kit TK-P620-UL
Tube Heaters longer than 20 feet require a Primary Kit and at least one additional Secondary Tube Kit.
- Primary Tube Kits include the flanged combustion chamber tube plus one additional tube
A Secondary Tube Kit requires a Primary Tube Kit.
- Secondary Tube Kits include steel heat exchanger tubes and turbulator if required.
* TURBULATORS:
- If a turbulator is required it is factory installed in a clearly labeled tube in the Secondary Tube Kit.
- A turbulator must always be installed in the last tube at the vent end of the heater.
160,000
200,000
90,000
130,000
Weight
Turbulator*
Tube Kit Part #
60,000
TUBE KIT PART # & QUANTITY REQUIRED
PRIMARY TUBE KITS
SECONDARY TUBE KITS
20 ft Secondary Kits
10 ft Secondary Kits
COMPLETE
60 Mbh
60 to 130
160 Mbh
200 Mbh
6 ft
None
None
None
None
2 ft
6 ft
TK-P620-UL
TK-P020-UL
TK-P160-UL
TK-P200-UL
TK-S020-UL
TK-S220-UL
TK-S620-UL
Input Btuh
Tube
Length
20'
20'
20'
20'
20'
20'
20'
20'
1
30'
1+
30'
1+
40'
1+
1
40'
1+
1
50'
1+
1+
50'
Stainless Steel Combustion Tube
1+
1
60'
Stainless Steel Combustion Tube
1+
1+
1
60'
Stainless Steel Combustion Tube
1+
1+
1
70'
Stainless Steel Combustion Tube
1+
2+
160,000
60,000
200,000
90,000
130,000
Turbulator* -->
Tube Kit Part #
Order: TUBE KIT PART # & QUANTITY REQUIRED
20 ft Secondary Kits
SECONDARY TUBE
PRIMARY TUBE KITS