Chapter 2: installation and startup, Mounting the pioneer-16r gas monitor, Wiring the pioneer-16r gas monitor – RKI Instruments Pioneer 16R User Manual
Page 6: Front view, Side view figure 2-1: outline & mounting

Chapter 2: Installation and Startup
Mounting the Pioneer-16R Gas Monitor
The subrack which houses the monitor is suitable for mounting in a 19” rack or rack enclosure. Position
the subrack in the rack as desired and use the mounting flange on each side of the subrack to mount it to
the rack with screws. .28” diameter slotted holes are provided on the flanges for mounting. Two .20”
diameter holes are also provided on the mounting flanges for mounting of a handles if desired.
CHANNELS
9 - 12
C
HANNELS
13 - 16
C
HANNELS
5 - 8
CHANNELS
1 - 4
ALARM
3
AL
A RM
1
1.48
Ø .28, 4X
4.49
.37
PI
L O
T
FA
I L
Ø .20, 4X
AL
AR M
2
PIONEER-16R
16 POINT GAS MONITOR
18.94
18.31
3.98
6.9
Front View
11.941
Side View
Figure 2-1: Outline & Mounting
Wiring the Pioneer-16R Gas Monitor
All external and detector wiring terminals are accessible at the back of the subrack. See the wiring diagram
below for external wiring connections.
Pioneer-R16 Operator’s Manual
Installation & Startup
5