2. Once it is determined if commercial power is required,

connect the load to the UVW terminals as shown in
Figure 33. These terminals can be found on the output
terminal panel, see page 35, Figure 14. To gain access
to the output terminals lift the UVW cover. Make sure to
tighten terminal nuts securely to prevent load wires from
slipping out.

Figure 33. UVW Terminal Lugs (Load)

Figure 32. 120 VAC Accessory Receptacle/Cable

DCA-180SSK — GENERATOR START-UP PROCEDURE

NEGA

TIVE

POSTIVE

BATTER

Y

3. Connect the negative battery cable (BLACK) to the

negative post on the battery (Figure 34).