beautypg.com

Setup, adjustment and operation, Setup – MK Diamond MK-145 220 Volt User Manual

Page 16

background image

MK Diamond Products Inc. Customer Service Department (800) 421-5830

MK-145

Revision 09/04, Effective date – September 23, 2004

Page

16

SETUP, ADJUSTMENT and OPERATION:

SETUP:


• Before powering or starting, check for damage, that could prevent this equipment from

proper operation or performing its intended function. Check for binding and improper
alignment of moving parts. Check for damaged, broken, or missing parts.

• Verify the On/Off switch is in the OFF position.

• Before connecting the MK-145 to a power supply, be sure the voltage, cycle and phase

of the job site power source meet the requirements of TABLE 3

VOLTAGE: 230v
CYCLE: 50/60Hz
PHASE: 1-phase

TABLE 3

• If using an extension power cord, ensure sure the length and wire gauge correspond to

the requirements listed in TABLE 1 on page 9. An extension power cord that is too
small in wire gauge (diameter), or too long in length, will cause the motor to overheat
and could cause premature failure.

• Use an approved Ground Fault Circuit Interrupter (GFCI)

• Do not cover the motor vents as this could lead to motor overheating.

• Do not overfill the Cooling Basin.

NOTE: In order to avoid breaker tripping, a 15-amp circuit breaker should be used.

STEP ACTION

1.

Blade Guard Alignment Verification
a) Place MK-145 on a flat, level surface
b) Verify the Diamond Blade is aligned with the

Blade Guard Support Angle using straight edge





2.

Blade Guard Adjustment
a) Loosen the Blade Guard Support Screw
b) Align the Blade Guard to the Diamond Blade
c) Retighten the Blade Guard Support Screw





3.

Remove Water Basin Cover
a) Lift Water Basin Cover
b) Pull out on Water Basing Cover to remove












Removal
Direction

Final Alignment

Verification

Blade Guard

Support Screw

Verify Alignment