beautypg.com

Initial switch-on, Initial switch−on, 5commissioning – Lenze E82ZAFLC010 User Manual

Page 44

background image

5

Commissioning

Initial switch−on

EDK82ZAFLC−010 DE/EN/FR 4.0

44

l

H1inbet−statusanzeige

Initial switch−on

)

Note!

ƒ

The standard device is only ready for operation if a HIGH level is applied to
terminal 28 (controller enable via terminal).
– Please note that the controller can be inhibited by various sources. The

sources act like a series connection of switches.

– If the drive does not start even though the controller has been enabled

via terminal 28, check whether the controller has been inhibited by
another source. Another source could be the

s key on the keypad.

ƒ

Please note the different status information for code C0068 compared to
software version "0.1" (see the following table).

Bit

Function

Description

8

RFR (controller enable)

0: no controller enable
1: controller enable

11

IMP (pulse inhibit)

0: pulses for power sections inhibited
1: pulses for power sections enabled

15

TRIP (fault)

0: no fault
1: fault exists