5

Commissioning

Before switching on

EDK82ZAFLC−010 DE/EN/FR 4.0

42

l

H1inbet−statusanzeige

5

Commissioning

Before switching on

(

Stop!

Before switching on the standard device with the function module in the
LECOM−B network for the first time

ƒ

check the complete wiring for completeness, short circuit, and earth fault.

ƒ

check whether the bus system is terminated physically at the first and last
station by the integrated active bus terminating resistor.(

^ 43)