Chapter, Filling & maintenance – Koolance RP-1200 User Manual
Page 13

18
19
User Manual
With the connected outlet 
hose, roughly estimate the 
length you will need to your 
first cooler, and cut it.
Cut the second hose with 
enough length to reach the 
last water block that will be in 
your system.
Using the leftover tubing, cut 
shorter pieces to link between 
each individual cooler.
Installation
Chapter
3
Filling & Maintenance
Liquid Coolers
You should now install the liquid coolers (CPU, GPU, Hard 
Drive, etc.) to your hardware before continuing this User Manual. 
Please refer to your cooler kit’s individual installation instructions, 
then continue on to the next section.
WARNING
:
The cooling system’s pump can not be run dry for any
period of time. Never power-on the computer or cooling system without 
sufficient liquid in the reservoir. Dry-running (and thereby damaging 
the pump) is not covered under the Koolance product warranty.
!
Continue connecting all of 
your coolers in the system 
until there are no longer 
any open tube ends.
NOTE: When filling the reservoir later, it will need to be pulled out from the front 
chassis drive bay by about 2.75” (7cm). Be sure to leave enough tubing between 
the reservoir unit and connected components to do this.
