A) b) c) d) e) – Kifco T45x1320 400,000 - Present Operator Manual User Manual
Page 17

CYCLE
CYCLE
PAUSE
PAUSE
ON
ON
OFF
OFF
1°
2°
<10m/h 10 - 20m/h 20 - 30m/h
20 - 30m/h 30 - 40m/h
> 50m/h
a)
b)
C)
d)
e)
First gear
(slowly)
First gear
(slowly)
Second gear
(faster)
Second gear
(faster)
- With an IRRIMEC hosereel
- The flow minimum / maximum:
Turbine 10/50: from 10 to 50 m³/h
Turbine 25/130: from 25 to 130 m³/h
- the pressure minimum / maximum:
From 0 to 10 Bars
- constructor
data:
By-pass lever
(actionned with ESC
with the actuator).
Adjustment speed screw
(Usable in case of problem
on the ESC or without ESC).
Or to limit the maximum speed
To slow
- The by-pass
To fast
Stop by-pass plate
(Without ESC, for block
the by-pass and
STOP WINDING
- Change
gear
- Before change gear,
Stop winding. (With ESC)
- Before change gear,
Stop winding. (Without ESC)
BEFORE ALL INTERFERENCE, TO STOP THE HOSEREEL, TO PUSH,
THE HOSEDRUM ON THE ANTI-RETURN PAWL AND TO VERIFY THAT THE PE
HOSE IS NOT IN TENSION.
Stop winding
and suppress the
hose tension
... made push the hosedrum on
the anti-return pawl.
- While lowering the tightener belt lever ...
- Once the hosedrum push on
the anti-return pawl.
- Lower the tightener belt lever, change gear on the gearbox or change ratio position for
belt on pulley, loosen the tightener belt and resume winding.
- Ratio speed
- The speeds are calculated at the beginning of the
winding with a minimum hosedrum diameter. For
efficiency and economy it is preferable that the turbine
rotation is included between 600 and 1000 RPM.
The values reported in these tables are averages for a hose-reel with a standard pulley. It is always possible
to make modifications and variations on the diameter of a pulley according to the needs of each customer.
Turbione
pulley:
Gearbox
pulley:
Gear change
lever
IMPORTANT:
Page 13