beautypg.com

Start up & operation – Kifco E23 360,000 - Present: Operator Manual User Manual

Page 16

background image

T23_AA_Operator Manual_2014

Revised 08/2014

Start Up & Operation

Step-by Step Operation Continued

10. Verify that the coils of tube remaining on the drum are both coiled and packed

tightly (photo). If they are not use the hand crank and PTO input on the gearbox to
tighten them.

11. Attach supply hose. Verify there are no kinks or twists in the supply hose.

12. Lower the anti reverse pawl prior to engaging the drive system.

13. Verify the turbine is off and turn on your pump. If your supply lines have not been used for an extended

period of time, flush them prior to attaching to the Water-Reel.

14. Engage the gear box via the clutch pin.

15. After all air is purged from the system and the sprinkler is operating smoothly allow water to go through

the system for several minutes to carry out any trash or debris that may have been in the mainline pipe.
After the system is thoroughly flushed, start the drive system by engaging the turbine.

Turbine Drive

Engage turbine and adjust speed control knob
after system is purged.

Warning! Do not pick up or hold

supply hose as it is being pressurized!

Engaged Position

Disengaged Position

Start

Stop

13