Bryant 701A User Manual

Installation, start-up and operating instructions, Phase single packaged electric cooling units

background image

NOTE: Read the entire instruction manual before starting the
installation.

This symbol

→ indicates a change since the last issue.

TABLE OF CONTENTS

SAFETY CONSIDERATIONS .....................................................1

INTRODUCTION ..........................................................................2

RECEIVING AND INSTALLATION ..........................................2

Check Equipment......................................................................2

IDENTIFY UNIT ................................................................2
INSPECT SHIPMENT ........................................................2

Provide Unit Support ................................................................2

ROOF CURB.......................................................................2
SLAB MOUNT ...................................................................2
GROUND MOUNT ............................................................2

Provide Clearances....................................................................2
Field Fabricate Ductwork .........................................................2
Rig and Place Unit....................................................................2

INSPECTION ......................................................................2
INSTALLATION ................................................................6

Connect Condensate Drain .......................................................6
Install Duct Connections ..........................................................6

CONFIGURING UNITS FOR DOWNFLOW (VERTI-
CAL) DISCHARGE ............................................................6

Install Electrical Connection ....................................................9

HIGH-VOLTAGE CONNECTIONS..................................9
SPECIAL PROCEDURES FOR 208-V OPERATION ...10
CONTROL VOLTAGE CONNECTIONS.......................10
STANDARD CONNECTION ..........................................10
TRANSFORMER PROTECTION....................................12

PRE-START-UP ..........................................................................12

START-UP ...................................................................................12

CHECK FOR REFRIGERANT LEAKS..........................12
START UP COOLING SECTION AND MAKE ADJUST-
MENTS ..............................................................................13
CHECKING COOLING CONTROL OPERATION .......13
CHECKING

AND

ADJUSTING

REFRIGERANT

CHARGE ...........................................................................13
INDOOR

AIRFLOW

AND

AIRFLOW

ADJUST-

MENTS ..............................................................................13
FOR 208/230V ..................................................................13
FOR 460-V GE MOTORS................................................16
COOLING SEQUENCE OF OPERATION.....................16

MAINTENANCE.........................................................................16

AIR FILTER......................................................................16
EVAPORATOR BLOWER AND MOTOR.....................16
CONDENSER COIL, EVAPORATOR COIL, AND CON-
DENSATE DRAIN PAN ..................................................17
CONDENSER FAN ..........................................................18
ELECTRICAL CONTROLS AND WIRING ..................21
REFRIGERANT CIRCUIT...............................................21
EVAPORATOR AIRFLOW .............................................21
METERING DEVICE — ACUTROL DEVICE .............21
LIQUID LINE STRAINER ..............................................21

Troubleshooting............................................................................21

Start-Up Checklist ........................................................................21

NOTE TO INSTALLER — Before the installation, READ THESE
INSTRUCTIONS CAREFULLY AND COMPLETELY. Also,
make sure the User’s Manual and Replacement Guide are left with
the unit after installation.

SAFETY CONSIDERATIONS

Installation and servicing of air-conditioning equipment can be
hazardous due to system pressure and electrical components. Only
trained and qualified personnel should install, repair, or service
air-conditioning equipment.
Untrained personnel can perform basic maintenance functions of
cleaning coils and filters. All other operations should be performed
by trained service personnel. When working on air-conditioning
equipment, observe precautions in the literature, tags, and labels
attached to the unit, and other safety precautions that may apply.
Follow all safety codes. Wear safety glasses and work gloves. Use
quenching cloth for unbrazing operations. Have fire extinguisher
available for all brazing operations. Consult a qualified installer or
service agency for information or assistance. The qualified in-
staller or agency must use only factory-authorized kits or acces-
sories when modifying this product.

WARNING: Before performing service or maintenance
operations on system, turn off power to unit. Turn off
accessory heater power switch, if applicable. Electrical
shock can cause personal injury.

Recognize safety information. This is the safety-alert symbol

.

When you see this symbol in instructions or manuals, be alert to
the potential for personal injury.

Fig. 1—Unit 701A and 702A

C99062

Installation, Start-Up
and Operating Instructions

3-PHASE SINGLE PACKAGED
ELECTRIC COOLING UNITS

Cancels:

New

II 701A-30-1

2-06

701A
702A

—1—