Gardman Alum Greenhouse User Manual
Page 9
Step
In this section, the four
greenhouse walls are joined
together and the roof
added. This phase is best
undertaken by two people.
Fit the profile end caps to
the roof and upright bars
before assembly.
Step
Bolt the bottom side and
front bars to the inside of
the corner post.
Step
Bolt the gutter side bar
to the inside of the
corner section.
Repeat 2 and 3 for all
four corners.
Step
Bolt the ridge bar to the
underside of the end roof
bars as shown.
Step
Bolt the roof glazing bars
to the ridge and gutter
bars, remembering to
insert a pair of bolts into
the channels where the
vent is to be fitted (8x6
and 6x6 houses only).
Lift the frame onto the
prepared base and fix
loosely. Check that the
frame is square and sits
nicely on the base before
tightening all nuts.
Profile
Code
4x6
6x6
8x6
D1
D3
G3
1
2
8
1
4
8
1
6
8
D Greenhouse Assembly
& Roof Section
D3
D1
(D1–4 = 4 x 6)
(D1–6 = 6 x 6)
(D1–8 = 8 x 6)
Pictures viewed from inside the Greenhouse except where stated
Outside view
D1
C4
1
3
&
2
4
4
5
1
2
3
4
5
M610
M6-1
Used for all sections so quantity not
listed in this or other parts lists.