beautypg.com

A greenhouse sides – Gardman Alum Greenhouse User Manual

Page 6

background image

A Greenhouse Sides

4 x 6

6 x 6

8 x 6

A1 and A2 are coded
by Greenhouse size.
e.g. :-

(A1–4 = 4 x 6)
(A1–6 = 6 x 6)
(A1–8 = 8 x 6)

A3

A2

A1

G1

Introduction
Lay parts on the
ground, as pictured at
the top of this page.
Assemble loosely
with the nuts to the
inside of the
structure.

Step
Insert bolt into the
channel in the
upright (A3).
Bolt glazing uprights
to the outside of the
bottom bar.

Step
Bolt diagonal braces
to inside of bottom
bar.
Note: the flat side of
the bottom bar faces
inwards.

Step
Before bolting the
glazing uprights to
the outside of the
top gutter bar, insert
bolts into the
channels for fixing
the diagonal braces.

Step
Use the inserted
bolts (see 3) to
secure the diagonal
braces to the
uprights. Do not
tighten yet.

Step
Bolt the diagonal
brace to the inside of
the top gutter bar.
Repeat for the other
side of the
Greenhouse.

Profile

Code

4x6

6x6

8x6

A1

A2

A3

G1

M610

M6-1

2

2

2

2

Used for all sections so quantity not
listed in this or other parts lists.

2

2

4

4

2

2

6

4

A1

A3

A1

G1

A2

A3

A3

G1

A2

G1

Note: Although there are different greenhouse

sizes, the steps are the same.

Pictures viewed from inside the Greenhouse except where stated

5

3

3

3

5

4

4

1

1

2

2

1

1

2

3

4

5