beautypg.com

Environmental express hotblock, Pro series, Definitions/markings – Environmental Express HotBlock Pro User Manual

Page 7: Installation of your hotblock, Installation requirements

background image

HotBlock™ Pro™:

Operation and Instruction Manual

Installation, Safety & Maintenance

5

Environmental Express

www.environmentalexpress.com / 800.745.8218 / 843.576.1147

Environmental Express HotBlock

TM

Pro Series

Environmental Express HotBlock™ Pro™ Series provides an efficient method of digesting and storing water, wastewater,

soil and sludge samples for metals analysis. These innovative digestion systems allow samples to be digested in a corrosion-
free environment using an external touch screen controller. Samples are handled in a small area with minimal radiant
heat loss. Users should be aware of potential dangers from heating certain types of compounds. Such hazards may include
explosion or the release of toxic or flammable gases.

Definitions/Markings

Each HotBlock

TM

Pro displays certain markings and symbols. All personnel working with the HotBlock™ Pro™s should

have an understanding of the following symbols and definitions:

• V = voltage
• ~ = alternating current
• Hz = frequency
• A = amperes

This symbol means Caution
Hot Surface
. The surface of the
HotBlock

TM

may be too hot to

safely touch with bare hands.

This symbol means Read
and become familiar with
instructions before operation of
instrument
.

Installation of your HotBlock

TM

Pro:

1. Plug the controller into an appropriate outlet. The HotBlock

TM

Pro must be plugged into a 20AMP receptacle.

2. The cord running from Block 1 plugs into the corresponding receptacle on the back of the controller. If using two

blocks, attach the cord from Block 2 to the controller in the appropriate receptacle.
If external thermocouple probes (optional) are NOT being used insert the two plugs included into the RTD1 and

RTD2 receptacles on the back of the controller.

If external thermocouple probes ARE to be used insert your probe plugs into these receptacles. RTD1 receptacle

corresponds to Block 1.

3. The HotBlock

TM

or blocks should be located in a vented enclosure while the controller must remain outside the

enclosure for ease of operation and to keep the controller removed from the corrosive digestion environment. (See
installation requirements, page 6).

Failure to locate your HotBlock

TM

controller outside the fume hood will void your product warranty.

Installation Requirements

Locate the HotBlock

TM

Pro under a fume hood with a minimum face velocity of 100fpm, and allow a minimum of 2” of

space on all sides. The following environmental conditions should be observed:

Ambient temperature range: 5-45°C

Ambient relative humidity: 0-100%RH

Altitude: sea level to 2500 meters

HotBlock

TM

Pros are rated as Pollution Degree 2 and Installation Category 2.

The HotBlock

TM

Pro Controller MUST be located outside the fume hood. Failure to do so will void your product warranty.