Unloading procedure & lift package contents – BASELINE Lift BL412 User Manual
Page 4

4
1. UNLOADING PROCEDURE & LIFT PACKAGE CONTENTS
For your information:
All lift components are packaged together in one module held together by steel frames
Optional accessories (ex. rolling jacks) are packaged separately.
UNPACKING PROCEDURE:
When the lift arrives on site:
1. If possible have lift unloaded in the installation area and on two 4"x 4" x 24" Wooden
Blocks (required for unpacking).
2. Check for freight damage and report immediately to the trucking company who
delivered the lift.
3. Check for missing parts and report immediately to the factory 1-877-799-LIFT(5438)
or (289) 291-3335
Main Components include:
Columns – 4 pcs
Runway Assemblies – 2 pcs
Crossbeams – 2 pcs
(1 front – 1 rear)
Powerpack – 1 pc
Accessories (see list below)
Accessory includes:
Lifting Cables – 2 pcs
Hydraulic Hose - 1 pc
Approach Ramps – 2 pcs
Wheel Stops – 2 pcs
Owner’s Manual – 1 copy
Hardware Box includes: Fittings, bolts, washers, nuts, shims, and anchor bolts, etc.