BASELINE Lift BL412 User Manual
Page 20

20
Note:
Attention shall be given to end connections. Upon development of two broken wires
adjacent to socket end connections, the rope shall be resocketed or replaced. Resocketing shall
not be attempted if the resulting rope length will be insufficient for proper operation.
CABLE&LOCKING LADDER ADUSTMENT
1. Adjust cable with lift fully lowered. Loosen nuts and then tighten them on cable stud on top
of column until each cable is not slack (slightly tightened).
2. Raise lift to full height and then lower lift at about 40’’.
3. Use a level, identify the lowest crossbeam end. Tighten cable nuts at that post to raise that
corner (this adjustment shouldn’t be more than 1’’).
4. Slight adjust the other three cables until runways are level at both front to rear and side to
side directions.
5. Raise lift to full height again and lower the lift to the top locking position. Check the runways
levelling. If the runways are not leveled, raise the lift to disengage locks and then adjust locking
ladders position correspondingly. Lower lift to the same locking position and check levelling
again. Repeat until runways are leveled.
Note: When adjusting cables and locking ladders, always leave at least 1/4’’ showing between
nut and stud end. Latches may not click in at the same time when vehicle is being raised. They
should be close. Be sure all four corners have passed the locking latch bar slot before lowering
lift on locking latches.