beautypg.com

Pole cap, Tie down after lacing, Raise side poles – Anchor CENTURY 80 WIDE User Manual

Page 9

background image

9

POLE CAP

Overlap the pole hole plates in the mid and
end fabric lace line. Push fabric and plates
up into cap and secure from underneath by
threading the female, flanged pipe coupling
onto the male pipe fitting molded to the
inside top of the pole cap.

4

POLE CAP

MOLDED CAP W/
MALE THREADED
PIPE FITTING

MID
FABRIC

END
FABRIC

FEMALE PIPE
COUPLING (FLANGED)

POLE PLATES
(OVERLAPPED)

LACE LINE

TIE DOWN AFTER LACING

After lacing and snapping sections, attach guys and
insert loosely into tension winches.

Insert web guy into slot in winch drum and
rotate 1 1/2 to 2 times to secure web.

WEB
RELEASE

(Push Downward)

Winch

Drum

WEB GUY

RAISE SIDE POLES

Start at downwind side. Insert each
side pole pin into side pole hole and
raise slightly less than perpendicular.
Bottom of each pole should be pointed
inward toward center of tent.

Wall ropes should run outside of corner
poles and side poles.

Tie jump rope around each side pole as
it is inserted in pole hole.

Continue around tent.

5

6

LACE

STAKE
BARS

WEBS ATTACHED
LOOSELY

SIDE POLES INSTALLED
ON DOWNWIND SIDE

SEE WEB GUY LAYOUTS FOR
STAKING CONFIGURATIONS.