Operation direction, Manual operation – A2Z Ozone Bed Sterilizer User Manual
Page 6

6
OPERATION DIRECTION
Put the mattresses, bed clothes, bed sheets, pillows, etc. into the
sealed plastic sterilization bags and then connect the ozone gas
transport pipes.
Turn on the power button ON. Then choose the sterilization time. Last,
press the thin film switch ON, and then the equipment would begin to
work. Count down the time, and when the clock reaches 00, the
disinfecting operation has finished.
After finishing the sterilizing operation, the equipment would ring. After
that, take off the gas transport pipes. The whole sterilization is finished.
Manual Operation
After main switch is turned on, the Default operation is manual, and
the light of channel 1 is on, which shows
“18” on the display.
Press “Selection channels” to choose the required channels, and
the relevant lights will be on.
1. Light 1 is on, indicating channel 1 is switched on.
2. Light 2 is on, indicating channel 1 and channel 2 are switched on.
3. Light 3 is on, indicating channel 1, channel 2, and channel 3 are
switched on.
After choose the required channels, press the relevant thin film