4 installation, 1 inspection and unpacking, 2 selecting the location – Eppendorf Excella E-10 Classic Platform Shaker User Manual
Page 11: Installation 4.1, Inspection and unpacking, Selecting the location
Installation
New Brunswick Excella® E-10 Open Air Shaker
English (EN)
11
4
Installation
4.1
Inspection and unpacking
Inspection of Boxes
After you receive your order from Eppendorf, inspect the boxes carefully for any damage that may have
occurred during shipping. Report any damage immediately to the carrier and to your local Eppendorf Sales
Order Department.
Packing List Verification
Verify against your packing list that you have received the correct materials.
Unpacking of Equipment
4.2
Selecting the location
Physical Location
It is essential that the instrument be situated in a area where there is sufficient space for the shaker and
platform to clear walls and obstructions during operation.
The surface on which the E-10 is placed must be smooth, level, and able to support the shaker under full
load operating conditions.
WARNING!
The E-10 is heavy. Two or more people are required to lift the shaker.
CAUTION!
There are two small plastic straps that held the bearing housing in place during shipping.
Once the shaker is unpacked and inspected, remove the straps from the bearing housing.
WARNING!
Do not position the equipment so that it is difficult to unplug from the mains/power.