Duct Connections

Fans.with.duct.connections.must.allow.for.inspection.of.

critical.clearances.between.rotating.and.stationary.parts.

and.must.allow.for.cleaning..Inlet.and.outlet.ducts.must.

have.sufficient.access.doors.to.allow.for.inspection.iden-

tified.in.this.bulletin.as.well.as.in.ES-2-06.

. The.layout.of.the.inlet.ducting.must.assure.that.the.

air.entering.the.fan.is.sufficiently.mixed.with.regards.to.

temperature.. Localized. hot. sections. of. the. air. stream.

could.become.a.hazard.if.they.are.at.a.higher.tempera-

ture.than.the.equipment.was.evaluated.for.

. Ducting.shall.be.so.arranged.that.the.fan.is.not.posi-

tioned.at.a.“low.point”.where.it.is.possible.for.foreign.

objects. or. liquid. to. lodge.. See. ES-2-06. for. additional.

duct.connection.requirements.

Guards and Enclosures

ATEX. fans. must. be. protected. to. at. least. IP20. of.

EN. 60529. against. the. ingress. of. foreign. particles.. To.

achieve.this,.the.mesh.size.used.for.guarding.must.not.

allow.particles.greater.than.12.5.mm.to.pass..A.mesh.

of. this. size. can. negatively. impact. fan. performance.. If.

it.is.possible.to.achieve.this.protection.for.the.fan.by.

using.a.mesh.located.away.from.the.fan.inlet.and.in.a.

lower.velocity.section.of.ductwork,.then.losses.due.to.

the.added.mesh.can.be.minimized...

. See. ES-2-06. for. additional. guard. and. enclosure.

requirements.

Electrical Supply and Controls

Electrical. equipment. for. ATEX. fans. must. comply. with.

an. equipment. group,. category. and. zone. according. to.

EN.60079-0.or.EN.50281-1-1.that.is.appropriate.for.the.

fan.it.is.driving./.monitoring.and.is.appropriate.for.the.

specific.environmental.conditions.at.the.place.of.instal-

lation.

. Any.monitoring.devices.used.must.be.checked.regu-

larly.to.assure.proper.operation.

. The.manufacturers’.instructions.for.all.electrical.sup-

ply,. controls. and. equipment. must. be. followed.. This. is.

particularly.important.in.the.case.of.thermally.protected.

motors.

. See.ES-2-06.for.additional.electrical.supply.and.con-

trol.requirements.

Vibration

Vibration. monitoring. is. mandatory. for. fans. that. are.

Category. 2D. in. the. airstream.. Alarm. shutdown. levels.

shall.meet.the.requirements.of.ISO.14694.

. See.ES-2-06.for.additional.vibration.considerations.

Maintenance

Safe.operation.of.ATEX.fans.rely.on.clearances.between.

rotating. and. stationary. parts. being. maintained.. These.

clearances.can.be.reduced.due.to.layers.of.combustible.

or.non-combustible.materials..Every.fan.must.be.inspect-

ed.regularly.and.cleaned.as.needed.to.avoid.a.buildup.

of. materials.. The. required. frequency. of. inspection. and.

cleaning. will. vary. based. on. application;. therefore. the.

user. must. determine. the. frequency. of. inspection. and.

cleaning.required.to.avoid.a.buildup.of.materials.

. Belt.drives.may.become.a.source.of.hazardous.tem-

peratures.if.they.are.not.tensioned.or.aligned.properly...

Drives. must. be. aligned. as. indicated. in. ES-2-06. and.

tensioned.as.indicated.on.datasheet.SF.5003.supplied.

by. Aerovent.. Replacement. belts. must. be. identical. to.

those.originally.supplied.

. Rotating.components.may.be.grounded.through.anti-

friction.bearings..Bearings.must.be.checked.and.if.nec-

essary.replaced.after.a.voltage.spike.or.similar.electrical.

incident.

. See. ES-2-06. for. additional. maintenance. require-

ments.

Fan Operation

Proper Use and Application

It. is. critical. that. ATEX. fans. are. used. as. intended. and.

in.accordance.with.the.limits.and.markings.of.the.fans...

ATEX. fans. are. supplied. with. a. datasheet. indicating. the.

operation. limits.. Operation. outside. of. these. limits. may.

cause.an.explosion.hazard.

. Operating. within. acceptable. vibration. levels. is. critical.

to.obtain.the.expected.life.of.the.fan.and.components..

Vibration.levels.must.be.in.conformance.with.ISO.14694..

In.addition,.fans.must.not.be.subject.to.external.vibration.

either.while.at.rest.or.during.operation.

. See.ES-2-06.for.additional.information.on.proper.use.

and.application.

Sound

See.ES-2-06.for.considerations.regarding.sound.

Operation Checklist

Required.clearances.between.rotating.and.stationary.parts.

must.be.verified.before.starting.the.fan..Clearances.indi-

cated.in.“ATEX.–.FAN.CLEARANCES.CHECKLIST”.must.

be. verified. with. the. fan. and. ductwork. installed. before.

startup..Form.“ATEX.–.FAN.CLEARANCES.CHECKLIST”.

is. specific. to. each. fan. and. is. included. with. the. ship-

ment. of. each. fan.. The. measured. clearances. should. be.

recorded. and. compared. to. the. design. minimum. values.

to.verify.that.the.design.requirements.are.met.before.the.

fan.is.started.

. See. ES-2-06. for. additional. items. in. the. operation.

checklist.

Troubleshooting Guidelines

See.ES-2-06.for.troubleshooting.guidelines.