Hydraulic operated attachment, Hydraulic operated attachment -11 – Lull 1044C-54 Series II Operation Manual User Manual
Page 79

Section 5 - Attachments
5-11
31200608
Hydraulic Operated Attachment
1. Install attachment (see page 5-9).
2. Lower attachment to ground and perform “Shut-Down Procedure” on page 4-4.
3. Connect attachment hoses to both auxiliary fittings (1).
4. If equipped, connect attachment hoses to both second auxiliary fittings (2).
1
2
OV0330