beautypg.com

Mueller Roll-Up Door C250 User Manual

Page 8

background image

8

877-2-MUELLER

B

Lift door using a forklift that has padded forks in order to prevent damaging or denting the door curtain.

Leave the forklift in position until the door is securely fastened to the mounting brackets.

C

Position door on brackets with dual tensioner and tension axle support resting safely on top of mounting

bracket flange. If a chain hoist or electric operator is installed; the mounting bracket may need to be adjusted
on the mounting plate to allow enough room for the chain hoist or electric operator.

D

Door should be positioned as close as possible to the door header and still be able to rotate the door so that

the bottom bar will clear the door header.

E

Each end of door should be equal distance from the header and the curtain must be centered in the opening.

DO NOT CUT BANDS OR WRAPPING.

STEP 8: LIFT DOOR

A

Orient door with bottom bar located at 7 o’clock

position. The bottom bar should be facing back into
the building.