Operation, A - first time operation, Step 1 – sk350 power management – Fast & Fluid SK350 User Manual
Page 9
Fast & Fluid Management – SK350
V 2.0
page 9
Operation
A - First time operation
Attention! Before operating your SK350 for the first time, please
ensure the frame lock was correctly removed (as indicated in pag.6)
Step 1 – SK350 power management
Unlock the emergency stop button on the front
of the machine by turning clockwise. The
machine is automatically switched on when the
power connector at the rear of the shaker is
plugged into a 220-240V wall socket.
The power led lighted-ON.
The machine is in stand-by modus. To awake the
machine from its sleeping modus, press any of
the interface buttons.
Please note that during normal operation there
should be no reason ever to take the power off
the machine. In case the shaker must be
switched off (e.g. for maintenance) there is only
one way of achieving this: unplug the power
connector at the back of the machine.
Turn the emergency stop
clockwise to unlock: the
power led is lighted-ON.
Attention! To prevent damage, the SK350 may only be connected to
either 220-240V/16A/50Hz power grids.