Fitting procedure – ARB 3462030 User Manual
Page 9
Last Rev Date: 3/4/06
Page 9 of 12
Fitting instructions# 3783194
Copyright © 2005 by ARB Corporation Limited. All rights reserved, this document must not be reproduced without the express authority of ARB Corporation Ltd
FITTING PROCEDURE
IF FITTING WINCH, CONTINUE ON THOUGH
STEPS 23 TO 33, 35 & 37.
NOTE: From the factory the 15000lb winch
handle should be in the position shown,
allowing bottom spooling off of cable with the
gearbox handle on the LHS when in bull bar. If
your winch handle will not clear the bull bar
when installed, undo the gearbox end screws.
Lift the gearbox up to just clear locating lugs
and rotate to correct position then retighten,
checking that seals are undamaged and a
draining hole is at bottom centre.
23. Remove cable retaining band and position
cable loop so it will go through roller fairlead
when it is placed in bull bar.
24. Fit control box bracket supplied using M6
bolts and flange nuts as shown.
25. Remove vertical rollers from RFL and set
aside.
NOTE: On some models, the roller fair lead
must be drilled prior to fitment.
26. Mark out as shown then using a 13.0 mm drill
bit, drill two holes as shown in diagram.
27. Lay winch on a suitable support table with
mount face up. With the help of an assistant,
lay the bull bar, face up, onto the winch.
28. Position the RFL bracket into position into
the viewer aperture and proceed to bolt up
the winch with original fasteners supplied with
winch.
29. Insert the vertical rollers into the RFL and fix
in position with M16 bolt and nyloc nut sets.
30. Tighten all winch mount bolts.
Warning: Drilling operations can result in
flying metal debris, safety glasses should be