6 Testing & Final Assembly
38
6.5
Post-Installation Check List
Now that the Air Locker installation has been completed, ARB
recommends that you take the time to complete the following check list
MXVWWRLQVXUHWKDW\RXKDYHQ¶WPLVVHGDQ\RIWKHYLWDOVWHSV
F
The air system has been leak tested.
F
Thread locking compound was used on the ring gear bolts.
F
All torTXHVHWWLQJVFRPSO\ZLWKWKHYHKLFOHPDQXIDFWXUHU¶VVSHFV
and were set with an accurate torque wrench.
F
Differential fluid complies with ARB recommendations and has
been filled to the correct level.
F
All air lines and wiring have been securely cable tied to resist
snagging.
F
Switch(es) have been securely mounted within operator reach, yet
well away from danger of accidental engagement.
F
Switch(es) function properly and illuminate to indicate that Air
Locker(s) are engaged.
F
All operators who are to use the Air Locker have read, and fully
understand the ARB Air Locker Operating & Service Manual.
F
The Air Locker Warning Sticker has been located within close
proximity of the actuator switch(es).
INSTALLATION PERFORMED BY:
DATE OF INSTALLATION:
ODOMETER READING:
ARB AIR LOCKER SERIAL No:
___________________________
___________________________
___________________________
___________________________