Caution – Bloomfield 9010 User Manual
Page 6

INSTALLATION INSTRUCTIONS
READ THIS CAREFULLY BEFORE STARTING THE INSTALLATION
Unpack the unit. Inspect all components for completeness and 
condition. Ensure that all packing materials have been removed 
from the unit. 
 
Verify that the Spray Head Gasket and Spray Disk are properly 
installed. 
 
LEVELING THE UNIT 
 
Verify that an adjustable leg is installed at each corner of the 
brewer. 
 
Set brewer in its operating location. Level the brewer. A spirit 
level should be placed on the top of the unit, at the edge, as a 
guide when making level adjustments. 
 
Level the unit from left to right and front to back by turning the 
adjustable feet. Be sure all four feet touch the counter to prevent 
tipping. 
 
PLUMBER’S INSTALLATION INSTRUCTIONS 
 
Brewer should be connected to a POTABLE WATER, COLD 
WATER line. Flush water line before connecting to brewer. 
  
DO NOT use a saddle valve with a self-piercing tap for the water 
line connection. Such a tap can become restricted by waterline 
debris. For systems that must use a saddle tap, shut off the main 
water supply and drill a 3/16” (minimum) tap for the saddle 
connection, in order to insure an ample water supply. Remember 
to flush the line prior to installing the saddle. 
 
The brewer must be installed on a water line with average 
pressure between 20 PSI and 90 PSI. If your water pressure 
exceeds 90 PSI at anytime, a pressure regulator must be 
installed in the water supply line to limit the pressure to not more 
than 90 PSI in order to avoid damage to lines and solenoid. 
 
A water shut-off valve should be installed on the incoming water 
line in a convenient location (Use a low restriction type valve, 
such as a 1/4-turn ball valve, to avoid loss of water flow thru the 
valve. 
 
NSF requires that the brewer be able to be moved for cleaning 
underneath. A flex line or loops of copper tubing will satisfy this 
requirement. See Figure 2 below. 
IMPORTANT: 
To enable the installer to make a 
quality installation and to mini-
mize installation time, the follow-
ing suggestions and tests should 
be done before the actual unit 
installation is started: 
 
CAUTION:
EQUIPMENT DAMAGE
DO NOT plug in or energize this 
appliance until all Installation 
Instructions are read and 
followed. 
Damage to the Brewer will occur 
if these instructions are not 
followed. 
CAUTION:
UNSTABLE 
EQUIPMENT HAZARD 
It is very important for safety and 
for proper operation that the 
brewer is level and stable when 
standing in its final operating po-
sition. Provided adjustable, non-
skid legs must be installed at 
each corner of the unit. Failure 
to do so will result in movement 
of the brewer which can cause 
personal Injury and/or damage to 
brewer. 
 
 
NOTE: Water supply inlet line 
must meet certain minimum 
criteria to insure successful 
operation of the brewer. 
Bloomfield recommends 1/4" cop-
per tubing for installation of less 
than 12 feet and 3/8" for more 
than 12 feet from a 1/2" water 
supply line.  
 
 
 
4
Fig. 2 Water Supply 
 Installation  
601
75815
Owner
s
M
anual In
tegri
ty Decante
r B
rewers
