beautypg.com

Bunn ULTRA-2 User Manual

Page 21

background image

21

1.

Install the seals over the flange
at the rear of the cooling drums
and press the seals firmly into
place as shown.

2.

Align the auger shafts with the
augers. Push the augers as far
as they will go and rotate them
so the flat face of the auger
shaft is aligned with the flat face
of the auger nose.

3.

Thoroughly rinse the hoppers
and install them over the augers
and cooling drums.

5.

Set the lids on the hoppers and
plug in the hopper lid lamp
cords.

9.

Assemble the drip tray.

7.

Slide the faucet valve assembly
into place on the hopper.

8.

Press down on the valve to
compress the spring. Position
the faucet handle over the fau-
cet valve one side at a time and
snap into place on the hopper.

6.

Position the faucet seal and re-
turn spring in the faucet valve.

4.

Slide them into place and push
them down until the hopper
lock plungers snap into place.

32080 032702

INSTALLATION