Pm complete ? no yes, 6 month pm (-) enabled (+) – Bunn ULTRA-2 User Manual
Page 13

13
Preventive Maintenance Complete?
This function is used to reset a reminder message Preventive Maintenance Due every six months. The ma-
chine will not shut down if service is not performed. When the service is performed and the message is answered
YES (ICE), the time and date is recorded for another six months to elapse. This feature can be DISABLED by
pressing (-) ULTRA hidden switch.
PM COMPLETE ?
NO
YES
32080 032702
6 MONTH PM
(-) ENABLED (+)
See also other documents in the category Bunn Water equipment:
- TDO-3.5 (2 pages)
- AF PR-2 (18 pages)
- TDS3 (2 pages)
- TCD (3 pages)
- ULTRA-1 (17 pages)
- ULTRA-1 (2 pages)
- TDS-5S (3 pages)
- EASY CLEAR H5E (2 pages)
- AFPO-2 SL (25 pages)
- EASY CLEAR EQ-12-TH (2 pages)
- WATER QUALITY SYSTEM EQHP-25L (2 pages)
- EASY CLEAR EQ-17-TL (2 pages)
- HW2 (4 pages)
- LCA-2 (22 pages)
- LCA-2 LP 38791.0000K (26 pages)
- HW2A (4 pages)
- FMD-2 (2 pages)
- SILVER SERIES JDF-2S (28 pages)
- FCD-4 (21 pages)
- EASY CLEAR EQHP-ESP (2 pages)
- FMDS-3 (2 pages)
- TDO-N-4.0LP (2 pages)
- ULTRA-2 PAFA (4 pages)
- JDF-2 (21 pages)
- LCR-2C (2 pages)
- TCD-2 (18 pages)
- FMD DBC-3 4-CUP (4 pages)
- LCR-3 (27 pages)
- EQHP-10L (2 pages)
- 2 (3 pages)
- Water Quality System EQHP-35L (2 pages)
- Chilled LCC-2 (26 pages)
- TDO-4T TDO-5 (2 pages)
- ICD3 (3 pages)
- Water Quality System EQHP-TWIN 108SP (2 pages)
- TCD-1 (2 pages)
- TDO-N (2 pages)
- FMD-5 (45 pages)
- JDF-4S (2 pages)
- JDF-2S (28 pages)
- AFPO-3 SL (25 pages)
- Complete Store Water Quality Systems EQHP-TWIN 70L (2 pages)
- EDSS-11-T200F (2 pages)
- TDO-N-3.5 (2 pages)