beautypg.com

Priming, Operating controls – Bunn SILVER SERIES JDF-4S User Manual

Page 8

background image

8

PRIMING

1. Open the dispenser door

2. Load concentrate per instructions in section titled Loading.

3. Close the dispenser door.

4. Place a large container under the appropriate dispense nozzle.

Press and hold the “Product Dispense Switch” Fig 5, until concentrate dispenses from the dispense nozzle.

Note: This may take several seconds, depending on the installation and set pump speed.

39992 023009

OPERATING CONTROLS

FIG 7 Refrigeration Switch - JDF-2S

Early Models

FIG 9 Product Dispense Switches - JDF-2S

Refrigeration Switch

The refrigeration switch is located on the Electrical Panel of the dispenser near the Circuit Board. This switch

controls power to the water bath pump and relay contacts for the compressor and condenser fan motor.

P3580-1

Product Dispense Switch (Mechanical Switch Machines)

Pressing and holding switch will initiate product flow from the respective nozzle; releasing the switch will stop

the flow.

P3583

FIG 10 Product Dispense Switches - JDF-4S

P3841

P3844

FIG 7A Refrigeration Switch - JDF-2S

Late Models

FIG 8 Refrigeration Switch - JDF-4S

Early Models

FIG 8A Refrigeration Switch - JDF-4S

Late Models

This manual is related to the following products: