beautypg.com

Check list, Hardware/literature pack – Bosch 25/32kW User Manual

Page 2

background image

INSTALLATION &
SERVICING INSTRUCTIONS

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32

8 716 113 389b (09/07)

1

Check List

Hardware/Literature pack

Item

Qty

Greenstar Heatslave External Installation/Servicing Instructions.........1

Users Instructions............................................................................................1

Hardware Pack.................................................................................................1

100mm Ø Services Duct................................................................................1

Condensate Trap Kit........................................................................................1

Warranty Return Envelope.............................................................................1

Cabinet Key.......................................................................................................1

SYMBOLS USED IN THIS MANUAL:

Domestic hot water

Central heating

Room thermostat

Frost thermostat

Wait time period

Programmer/timer OFF

PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION.

THESE INSTRUCTIONS ARE APPLICABLE TO THE WORCESTER APPLIANCE MODEL(S)

STATED ON THE FRONT COVER OF THIS MANUAL ONLY AND MUST NOT BE USED WITH

ANY OTHER MAKE OR MODEL OF APPLIANCE.

THE INSTRUCTIONS APPLY IN THE UK ONLY AND MUST BE FOLLOWED EXCEPT FOR ANY

STATUTORY OBLIGATION.

THIS APPLIANCE MUST BE INSTALLED BY A COMPETENT PERSON. FAILURE TO INSTALL

CORRECTLY COULD LEAD TO PROSECUTION.

COMPLYING WITH THE BUILDING REGULATIONS:
This heating appliance forms part of the controlled services for the building. It is law that all controlled
services for buildings must comply with building regulations. You must be able to satisfy your Local
Authority Building Control Body (LABC) that the work carried out concerning the installation and
commissioning of this heating appliance has been carried out to a satisfactory standard.

OFTEC operate a competent persons scheme and registered installers are able to certify that their
work complies with building regulations. Under the scheme;

OFTEC must be informed about every installation.

OFTEC will issue a building regulations compliance certificate to the householder and will
notify the LABC.

OFTEC provide controlled document forms CD10 and CD11 for use during installation and
commissioning respectively.

Other organisations operate self-certification schemes e.g. NAPIT and BESCA Ltd. and it may be
possible for installers who are members of these organisations to self certify their work.

Alternatively you must submit a building control notice to the LABC before installing any boiler. The
LABC will then arrange regular inspection visits during the work to ensure that the installation
complies with the regulations.

IF YOU ARE IN ANY DOUBT CONTACT THE WORCESTER TECHNICAL HELPLINE.

DISTANCE LEARNING AND TRAINING COURSES ARE AVAILABLE FROM WORCESTER.

PLEASE LEAVE THESE INSTRUCTIONS WITH THE COMPLETED COMMISSIONING FORM

AN D TH E US E R MAN UAL WITH TH E OWN E R OR WITH TH E APPLIANC E AFTE R

INSTALLATION OR SERVICING. THE SERVICE INTERVAL RECORD CAN BE FOUND ON

THE BACK PAGE OF THIS MANUAL.

ABBREVIATIONS USED IN THIS MANUAL:

Ø

Diameter

CH

Central Heating

DHW

Domestic Hot Water

TRV

Thermostatic Radiator Valve

IP

Ingress Protection

CF

Conventional flue

BF

Balanced flue

N/A

Not allowed

SEDBUK

Seasonal Efficiency of Domestic Boilers in the United Kingdom

OFTEC

Oil Firing Technical Association for the Petrolium Industry

IEE

Institute of Electrical Engineers

LABC

Local Authority Building Control Body

STORE THE APPLIANCE IN A DRY AREA PRIOR TO INSTALLATION.

INSTALLATION & SERVICING INSTRUCTIONS

IMPORTANT HANDLING INSTRUCTIONS:

It is advised that more than one person is involved

in the transfer of the packaged appliance from the

van to the point of installation.

It is advised that no attempt should be made to

move the packaged appliance without the use of

a suitable truck.

At all times the correct method for handling

heavy objects should be strictly observed.

GENERAL HANDLING GUIDELINES:

Lift only a manageable weight, or ask for

help.

When lifting, bend the knees, and keep the

back straight and feet apart.

Do not lift and twist at the same time.

Lift and carry items close to the body.

Wear protective clothing and gloves to

protect from any sharp edges.

Programmer ON CH only

Programmer ON DHW only

Programmer ON CH and DHW

Cold water main supply

Electricity supply

This manual is related to the following products: