Upflow downflow horizontal – Bryant Gas Furance 315AAV User Manual
Page 14
14
Supply Air Connections
For a furnace not equipped with a cooling coil, the outlet duct
shall be provided with a removable access panel. This opening
shall be accessible when the furnace is installed and shall be of
such a size that the heat exchanger can be viewed for possible
openings using light assistance or a probe can be inserted for
sampling the air stream. The cover attachment shall prevent leaks.
Upflow and Horizontal Furnaces
Connect supply--air duct to flanges on furnace supply--air outlet.
Bend flange upward to 90_ with wide duct pliers. (See Fig. 14.)
The supply--air duct must be connected to ONLY the furnace
supply--outlet--air duct flanges or air conditioning coil casing
(when used). DO NOT cut main furnace casing side to attach
supply air duct, humidifier, or other accessories. All accessories
MUST be connected to duct external to furnace main casing.
NOTE: For horizontal applications, the top most flange may be
bent past 90_ to allow the evaporator coil to hang on the flange
temporarily while the remaining attachment and sealing of the
coil are performed.
Downflow Furnaces
Connect supply--air duct to supply--air outlet on furnace. Bend
flange inward past 90_ with wide duct pliers (See Fig. 14.) The
supply--air duct must be connected to ONLY the furnace supply
outlet or air conditioning coil casing (when used). When installed
on combustible material, supply--air duct must be connected to
ONLY the factory--approved accessory subbase, or a
factory--approved air conditioning coil casing. DO NOT cut main
furnace casing to attach supply side air duct, humidifier, or other
accessories. All accessories MUST be connected to duct external
to furnace casing.
UPFLOW
DOWNFLOW
HORIZONTAL
YES
NO
NO
YES
YES
YES
NO
120
°
MIN
YES
120
°
MIN
YES
120
°
MIN
90
°
90
°
A02020
Fig. 14 -- Duct Flanges
315AA
V