beautypg.com

Sequence of operation flow chart – American Water Heater ABCG3 User Manual

Page 31

background image

31

SEQUENCE OF OPERATION FLOW CHART

Description of this flow chart can be found in the “SEQUENCE OF OPERATION” section.

Switch power on

to unit.

Thermostat calls

for heat.

Ignition Control

Board performs

diagnostic check on

components

Ignition Control

Board sends power

to Exhaust Inducer

Exhaust Inducer

engages Prover

Switch

Ignition Control
Board provides

power to Silcon

Nitride Ignitor

Silicon Nitride

Ignitor

warms up for

20 seconds

Ignition

Control Board

opens Gas

Valve.

Ignition Control
Board shuts off

Silicon Nitride

Ignitor after

3 seconds

Ignition Control

Board waits 3 more

seconds to

monitor Flame

Sensor.

Did Main

Burner Light?

YES

Ignition Control
Board monitors

units until T’Stat

is satisfied.

Ignition Control

Board shuts off Gas

Valve and allows the

Exhaust Inducer to

purge appliance for

20 seconds.

NO