beautypg.com

Vollrath Hot Cold Drop-ins User Manual

Page 4

background image

C

ountertop

W

arming

and

d

isplay

O

peratOr

s

M

anual

4

17. Cut and install the drain tubing (C), “T” fittings (D) and clamps (B) as

needed and route to drain. See Figure 6.

B

D

A

B

C

Figure 6. Drain Tube, Clamp and “T” Fitting.
18. Tighten all clamps.
19. Install the unit, read and follow the Operator’s Manual instructions for safe

and correct use.

20. Pour 1/4 cup of clean fresh water into each well drain. Switch the mode

control to refrigeration. See Operator’s manual. Turn the power switch to

the “ON” mode. Water should drain. Repeat for all wells.

Installation of Manual Drain Model Kits:

1. Turn power switch to the “OFF” position and unplug from power

source.

2. Remove all water from the wells.

C

B

D

A

B

Figure 7. Water Reservoir and Well Assembly.
3. Cut and install the drain tubing (C), “T” fittings (D) and clamps (B) as

needed and route to drain. See Figure 7.

4. Tighten all clamps.
5. Install the manual “drain plug(s)” provided in the well bottoms to hold

water in the wells. See operation of manual drain plug on following

page.

6. Wait until the water in the well has completely cooled before removing

the manual “drain plug(s)”.