beautypg.com

Warranty, Ce compliance – Young Wind Monitor Model 05103 User Manual

Page 5

background image

Page 4

05103-90(K)

VERTICAL SHAFT BEARING REPLACEMENT

Vertical shaft bearings are much larger than the anemometer

bearings. Ordinarily, these bearings require replacement less

frequently than anemometer bearings. Check bearing condition

using a Model 18331 Vane Torque Gauge.

Since this procedure is similar to POTENTIOMETER

REPLACEMENT, only the major steps are listed here.

1. REMOVE MAIN HOUSING

2. UNSOLDER TRANSDUCER WIRES AND REMOVE

TRANSDUCER ASSEMBLY

Loosen set screws at base of transducer assembly and

remove entire assembly from vertical shaft.

3. REMOVE VERTICAL SHAFT BEARING ROTOR by sliding

it upward off vertical shaft.

4. REMOVE OLD VERTICAL BEARINGS AND INSTALL

NEW BEARINGS. When inserting new bearings, be careful

not to apply pressure to bearing shields.

5. REPLACE VERTICAL SHAFT BEARING ROTOR.

6. REPLACE TRANSDUCER & RECONNECT WIRES

7. REPLACE MAIN HOUSING

8. ALIGN VANE

9. REPLACE NOSE CONE

WARRANTY

This product is warranted to be free of defects in materials and

construction for a period of 12 months from date of initial purchase.

Liability is limited to repair or replacement of defective item. A copy

of the warranty policy may be obtained from R. M. Young Company.

CE COMPLIANCE

This product has been tested and shown to comply with European

CE requirements for the EMC Directive (see Declaration of

Conformity below). Please note that shielded cable must be used.

Declaration of Conformity

R. M. Young Company

2801 Aero Park Drive

Traverse City, MI 49686 USA

Model 05103 Wind Monitor

The undersigned hereby declares on behalf of R. M.

Young Company that the above-referenced product, to

which this declaration relates, is in conformity with the

provisions of:

Council Directive 2004/108/EC (December 15, 2004)

on Electromagnetic Compatibility

David Poinsett

R&D Manager