beautypg.com

Installing your fence assembly – SawStop Fence Assembly User Manual

Page 4

background image

1. Locate the front rail, the left and right rear rails, and hardware pack #3 (see

Fig. 1). All of the hardware needed to install the rails is located on hardware

pack #3. In order to easily identify the hardware used in each of the following

steps, the different pieces of hardware are numbered on the hardware pack and

in the figures. If you are missing hardware pack #3 or any of the other fence

assembly components, call the SawStop Service Department at 503-682-6222

for replacements.

You will also need the following tools to complete the fence assembly:

• two 13 mm wrenches (or adjustable wrenches)

• a level or straight-edge

• a rubber hammer or mallet

Installing Your Fence Assembly

Fig. 1

2. Remove eight M8 x 20 square head screws from the

hardware pack and slide the square head of each

screw into the slot along the rear edge of the front rail

(see Fig. 2).

Fig. 2

3. Adjust the position of each square head screw so that all eight screws align with the corresponding mounting

holes in the front edge of the table top and extension wings (see Fig. 3). Position the front rail against the edge

of the table so that the eight screws extend into their corresponding mounting holes. Make sure the rulers on

the front rail face up.

Fig. 3

16

16

Note: Your contractor saw must be fully assembled before installing the fence assembly.

slot

end view

2 SawStop Contractor Fence Assembly

Installing the Fence Rails Assembly

Hardware for Steps 1-11

Square Head Screws, M8 x 20

(10 + 1 extra)

16

Lock Washers, M8

(22 + 1 extra)

17

Hex Nuts, M8

(18 + 1 extra) 18

Hex Screws, M8 x 16

(8 + 1 extra)

19

Carriage Bolts,

M8 x 20 (4)

20

Hardware Pack

#

3

Sa

w

St

op