beautypg.com

Rugged Ridge All Terrain Fender Flare Kit, 87-95 Jeep Wrangler (YJ) User Manual

Cj/yj all terrain flare kit

background image

Rev. 11/11

Page 1 of 4

SB

PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE YOU BEGIN.

YJ: 11630.10

CJ: 11633.10

CJ/YJ ALL TERRAIN FLARE KIT

HARDWARE LIST:

1. M5 Socket Head

Cap Screws-(28)

2. M5 Flat Washers-(28)

3. M5 Flange Nuts-(28)

4. 7mm Rubber Spacers-(22)

5. 13mm Rubber Spacers-(10)

6. Edge Trim-(1 roll)

7. Edge Trim Tool

REQUIRED TOOLS:

1. Drill

2. 1/4” Drill Bit

3. 6mm Allen Wrench

4. 10mm Wrench

5. 5/16” Wrench

6. Felt Tip Marker

7. Scissors

8. Isopropyl Alcohol

*See page 3 for optional painting instructions.

*See page 4 for optional fender trimming for over 33" tires.
Step 1. Remove front factory side markers. Do not discard front markers,

they will be reused. Remove all flares including the front flare

extensions. Clean body surface where new flares will mount.

Temporary removal of rear fender well liners may be necessary for

installation of flares.

Step 2. Clean inside mounting lip edge with rubbing alcohol. Install edge

trim as shown in the figure, removing red vinyl tape covering only a

few inches at a time. Do not pull trim while being applied, this may

cause shrinkage after installation.

Step 3. Installing the front flares. Use the front marker light mounting holes

for flare alignment. With the marker light temporally installed, align

the bottom of the rear edge of the flare with the bottom edge of the

body. Once the flare looks aligned, mark the mounting holes with a

felt tip marker. Next remove the marker light and drill the bolt

mounting holes using a 1/4” drill bit. Repeat the same procedures for

both front fender flares.

Step 4. Installing the rear flares. Align the bottom rear edge of the flare with

the vertical body panel seam towards the rear corner of the vehicle

and the bottom front edge with the bottom of the body. Once the

flare looks aligned, mark the mounting holes with a felt tip marker.

Next remove flare and drill the bolt mounting holes using a 1/4” drill

bit. Repeat the same procedures for both rear fender flares.

YJ: 11632.10