beautypg.com

Installing azek resurfacing transition pavers, Resurfacing transition pavers, Page 3 – AZEK Bullnose Paver & Transition Paver User Manual

Page 3

background image

Page 3

Installing AZEK Resurfacing Transition Pavers

4X8 PAVERS IN

DESIRED PATTERN

SUB-STRUCTURE

TRANSITION PAVER

SCREW TABS

APPLY ADHESIVE

GRID

TRANSITION PAVER TO BE FULLY

SUPPORTED BY SUB-STRUCTURE

TRANSITION PAVER

SUB-STRUCTURE

GRID

45°

SUB-STRUCTURE

TRANSITION PAVER

4X8 PAVERS IN

DESIRED PATTERN

SCREW TAB

APPLY ADHESIVE

GRID

CUT TRANSITION

PAVER 1 AS SHOWN

CUT TRANSITION PAVER 2 AS SHOWN

TRANSITION PAVER TO BE FULLY

SUPPORTED BY SUB-STRUCTURE

TRANSITION PAVER

SUB-STRUCTURE

GRID

Resurfacing Transition Pavers

• Choose a starting point based on the dimensions of the project and the desired pattern.

• Trim expansion nubs off front edge of grid.

• Apply 1/4" bead of adhesive to the top ribs of the Grid.
(Titebond PROvantage Landscape Adhesive is recommended).

• Place Transition Paver onto the Grid, pressing firmly.

• Screw down the visible tabs into the Grid using 1" Screws.

• Do not screw into subsurface.

• Slide adjacent Transition Pavers into place until finished.

• May need to cut off exterior tabs)

• Let cure for a minimum of 72 hours.

Corner Assembly